Renovated
School Plan |
| v |
Task |
Description |
Responsible
Area |
| 1. |
Location
of temporary feeding site |
Temporary
feeding site must be approved by
DHEC before occupancy. Approval use
of all disposal, no cooking. |
Facility
Services SNS |
| 2. |
Delivery
route to loading dock |
Temporary
roads must be constructed of a smooth
surface for delivery of food. |
Facility
Services |
| 3. |
Loading
docks |
Temporary
loading docks must allow trucks clear
and easy backing space to drop off
heavy food carts, and other necessities. |
Facility
Services |
| 4. |
Cafeteria
location |
Temporary
cafeteria must accommodate at least
one half of the student population
at one sitting for meals. |
Facility
Services |
| 5. |
Equipment
for temporary location |
Minimum
equipment needs:
A. Reach-in refrigerator
B. Milk Box
C. Hot Serving Line w/sneeze guard
D. Cold Serving line w/sneeze guard
E. Preparation table
F. Lockable storage space
G. Portable warming units
H. Hand wash sink w/hand soap, paper towels
I. Toilet
J. Ice machine or large ice chest
K. Computer and printer
L. Computer stand
M. Telephone and data port access |
Equipment
Movement,
Maintenance Services, SNS |
| 6. |
Furniture
for temporary location |
Furniture
moved from cafeteria to temporary
location. |
Equipment
movement |
| 7. |
Electrical
power and water |
Assessment
of the power/water needs for equipment.
Hand wash sink in kitchen with hot
running water. |
Facility
Service
Maintenance |
| 8. |
Office
Space |
Sufficient
space for desk, chair, file cabinet
for counting money, and securing
records. |
Equipment
Movement |
| 9. |
Equipment
Testing and serving line logistic |
Meet
with staff and manager to test equipment
for readiness. Meet with principal
to work out serving logistics. |
Maintenance
SNS |
| 10. |
Staffing |
Discuss
temporary feeding, parking arrangements
with kitchen staff and manager. |
SNS |
| 11. |
Temporary
facility cleaning |
Custodial
support in cleaning temporary facility. |
Custodial
Services, SNS |
New
School Impact Plan |
| 1. |
Hire
a consultant |
The
consultant will work with SNS and
the architect on design, equipment,
furniture, and color coordination
of student restaurant. |
Purchasing |
| 2. |
Meet
with consultant and architect |
Finalize
design of middle and high school
cafeteria. |
Student
Nutrition Services |
| 3. |
Present
design plans |
Once
plan approved by administration,
monitor progress. |
Student
Nutrition Services
Consultant |
| 4. |
Move
in |
Facility
occupancy:
A. Meet with DHEC inspectors
B. Meet with equipment vendor to schedule staff training on equipment
C. Make staff selections and arrange training and detail cleaning
D. Do test run of all equipment before school opens
E. Collect all warranty document from equipment vendor for permanent
storage |
Facility
Services
Maintenance Services
Student Nutrition
Services |